company >>
contact >>
    CGS plus find

Sezana Terminal - Rail track rehabilitation

Project included works on rail track intersection at Sezana Terminal. The works were done on rail geometry regulations of tracks 106, 107 and 113. For rehabilitation works survey points were obtained from current tracks. Points were than precessed in FERROVIA software with special tools for data processing of differences between designed alignment and surveyed points of current track position. Aditional insurance points were also measured for alignment reference. Data were than labeled in drawing and exported for use in tamping machines. 

Download Google Earth to view this link

You can read more about maintenance, rehabilitation and track geometry regulations tools in Features & Specifications. Ferrovia's specialized tools for maintenance puropse proved to be exactly what is needed in the field for fast and accurate data processing and enabling projects to be concluded in very short terms for establishing high track capacity and safety.

Other projects were also done with Ferrovia maintenance tools:

- PIVKA Terminal

- ILIRSKA BISTRICA Train station

Slovene national rail offices authorised for maintenance projects (SŽ SVP) in Maribor, Celje and Nova Gorica are already making their first projects with use of Ferrovia software.


Rail track 106 - direction West

Rail track 106 - direction East

Rail intersection point

Survey Points (DWF format)

Layout (DWF format)

Longitudinal Sections (DWF format)

 

More information

Need more information?
Click link and fill in the form

Contact us

Contact us
Call us or send us an e-mail

Find a reseller Find a Reseller
Download trial

Download Trial
Download fully-functional free trial

Terms Of Use © CGS plus, 2013 Login